Please review the photos below and read our short explainations of each project, Contact us for more examples of completed projects or a list of references.

 

Lowes:

Worked directly for Lowes, doing repaint work for 4 stores within the Pittsburgh area.

Scope of Work:

  • Remove existing paint by means of powerwashing, chemically stripping, or sand blasting
  • Prime and repaint all surfaces (interior and exterior)
  • Work within stringent guidelines for material application to include documentation of all ambient weather conditions
  • Time frame for completion - 12 weeks

 

Rite Aid:

Completed over 400 stores from new construction to simple repaints for various general contractors

Scope of Work:

  • Patch, prime, and paint all interior and exterior surfaces to facilitate a color change
  • Completed stores in all states east of Ohio and north of the Mason Dixon Line

 

Harrison City Auto:

Renovated building exterior to include EIFS work, soffit and fascia, new windows, new doors, T-111 siding, and complete repaint.

Scope of work:

  • Time frame for completion - 4 weeks

 

Vissman Lake House:

Completed new construction of log sided buildings and structures on the property.

Scope of work:

  • Constructed large 3 car log sided garage
  • Constructed gazebo
  • Installed Woodguard stain system on the exterior and Sikkens Stain System to all interior surfaces on log home and all out door buildings
  • Time frame for completion - 4 months